Silver Spring, MD — A toolbox talk recently published by CPWR – The Center for Construction Research and Training features guidance on planning a safe lift with a crane.
The resource – available in English and Spanish – includes a short story and subsequent questions to consider, safety tips, and a way to communicate how organizations can “stay safe today.”
Among CPWR’s recommendations is to conduct a lift planning meeting with all workers involved before beginning. Additionally, don’t lift a load that exceeds the capacity of the crane or rigging; monitor the weather, ground conditions and other environmental factors; and keep the crane clear of obstructions such as overhead power lines.
“Before a lift, it is important for everyone involved to understand their roles, the hazards associated with rigging and hoisting, and how to safely execute the lift to prevent any injuries or fatalities,” CPWR says.



